Upcoming Government Projects in Thane: If you live in Thane or are thinking of buying a home here, then boss, you’re on the right track! Thane is no longer just one of Mumbai’s “neighbors”; it has itself become a mega-hub. By 2026, Thane’s map will be completely transformed, because the government is working on infrastructure projects here worth billions.
We all know Thane’s biggest problem is traffic. But the projects lined up now will not only cut travel time but also send property prices through the roof. Whether it’s the metro, tunnels, or new water transport projects, Thane is literally “leveling up.” In this guide, we’ll go into detail about when each project will be ready and how it will impact your life.

Thane Metro Line 4 and 5 Update: A New Path of Connectivity
Metro Line 4, set to become Thane’s lifeline, which will connect Wadala to Kasarvadavali, and Line 5, which will connect Thane to Bhiwandi and Kalyan, are now in their final phases. If you commute daily on Ghodbunder Road or to Mumbai, then believe me, this news is nothing short of a blessing for you.
Metro Line 4 (Green Line)
This line is 32.32 km long and will directly connect major areas of Thane West, such as Teen Hath Naka, Cadbury Junction, and Kapurbawdi, to South Mumbai and the Eastern Suburbs.
- Status: Its civil work is almost complete, and only finishing work is underway at the stations.
- Benefit: It is expected to reduce traffic on the Eastern Express Highway by 30-40%.
Metro Line 5 (Orange Line)
This line will connect Thane to Bhiwandi and Kalyan. Its first phase from Thane to Bhiwandi is very important, as the people here are greatly troubled by the traffic, which is increasing very rapidly.

Quick Snapshot of Metro Impact:
| Feature | Details |
| Travel Time Reduction | Up to 50% savings |
| Real Estate Impact | 15-20% price hike near metro stations |
| Integration | Seamless connectivity with the Monorail and Suburban Railway. |
The government is now focusing not only on land-based connectivity but also on water routes. Maharashtra Maritime Board (MMB) Work is also underway on the Thane–Vasai–Kalyan water transport route. Thanks to these infrastructure developments, Thane has become an ideal residential hub for people today. For more information, you can visit the MMRDA’s Official Infrastructure Portal to track projects live, which is a high-authority source for government planning.
My opinion: If you’re thinking of investing in this city, check properties within a 1 km radius of metro stations, because that’s where you’ll get the highest rental yields.
Thane-Borivali Twin Tunnel: A Journey in Just 15 Minutes!
If you commute from Thane to Borivali or the Western Suburbs for work or business, you know how bad the traffic is on Ghodbunder Road or the Western Express Highway. Sometimes it takes 1.5 to 2 hours and people get stuck in traffic. But the Thane-Borivali Twin Tunnel project is the permanent solution to this problem.
This tunnel will pass underneath Sanjay Gandhi National Park (SGNP). Its total length will be approximately 11.8 km, and it will start from Tikuji-ni-Wadi in Thane and end on the Western Express Highway in Borivali.
- Game-Changer Factor: The journey, which currently takes over an hour, will be reduced to just 12 to 15 minutes once the tunnel is completed.
- Environmental Care: Since this tunnel will run underground, the forests and wildlife above will not be harmed. It will also be equipped with advanced ventilation and fire safety systems.
- Project Cost: Approximately ₹16,000 crore is being spent on this project, and work has already begun in earnest, with the project expected to be completed ahead of schedule.

Thane Coastal Road & New Flyovers in Thane West: Will Traffic Get Relief?
The Metro alone was not enough to handle the traffic on Thane West and Ghodbunder Road, so the MMRDA and TMC have also planned the Thane Coastal Road (Balkum to Gaimukh).
This 13-km-long road will run along the Thane creek side and parallel to Ghodbunder Road. Its biggest advantage will be that people who want to bypass and go directly to the Ahmedabad Highway or Mumbai will not have to get stuck in the middle of the city.
Internal Flyovers and Road Widening
To smooth Thane’s internal traffic, work is underway on several other key projects, including:
- Kopri Bridge Widening: Work is almost complete, which has reduced congestion at the Mumbai-Thane entry point.
- Teen Hath Naka Improvement: Plans include a new pedestrian subway and flyover extensions to help this “India’s most congested junction” shed its tag.
- Kalyan-Bhiwandi Bypass: This will reduce the entry of heavy trucks into Thane city.
Investment Insight:
In areas around the coastal road, such as Balkum and Kolshet, developers have started major township projects, and some are still in the development zone. In these areas, the demand for and prices of “Creek View” properties are set to rise rapidly.

What will be its impact on the Real Estate Market?
I am a RERA-certified real estate advisor, and from my experience, I can tell you that the relationship between infrastructure and property rates is like ‘Choli-Daaman’ (inseparable). The impact of all the upcoming government projects in Thane has now started to be seen in the real estate market.
Previously, people considered Thane the “cheaper option” to Mumbai, but today it has become a premium destination.
- Price Appreciation: Over the past 3 years, property values in Thane’s prime areas like Majiwada, Balkum, and Kolshet have increased by 15% to 25%. By 2026, when the Metro and Tunnel are ready, this growth is expected to accelerate, potentially reaching 30% to 40%.
- Rental Income: Due to improved connectivity, corporate employees are now preferring Thane, which has significantly boosted rental demand and is expected to increase further.
- Commercial Growth: Not just residential properties, but large IT parks and corporate offices are also shifting to Thane, fostering a “Walk-to-Work” culture.
If you are an investor, the segment in Thane from 37 Lacs to 1.5 Cr is the most liquid. If you would like to take our advice on this, please fill out the form below.
Smart City Initiatives & Other Social Infrastructure
Thane is not just stopping at roads and tunnels. Instead, under a “Smart City” mission, the Thane Municipal Corporation (TMC) is making the city digital and eco-friendly.
- DigiThane: A digital platform where citizens can get all services (tax payment, complaints, updates) with a single click.
- Water Transport: The Thane-Vasai-Kalyan water route will not only reduce traffic in the city but could also become a new tourist spot.
- New Parks & Open Spaces: Thane is known as the “City of Lakes,” and now, Masunda Lake and Upvan Lake are being beautified to create world-class public spaces.
- Thane Station Redevelopment: Thane railway station is being converted into an “Integrated Transport Hub” where buses, metro, and trains will connect in one place.
Upcoming Lifestyle Upgrades
| Project | Expected Impact | Target Completion (Approx) |
| New Civil Hospital | Better Healthcare Facilities | 2026 |
| Integrated Command Centre | City-wide CCTV & Safety | Ongoing |
| Solar Street Lights | Energy Efficiency | Phase-wise |

Conclusion: Is Thane the Best for Investment?
The bottom line is that Thane is now one of India’s top cities not just for living but also for investing. The government’s planning here is crystal clear: they want to make Thane an independent sibling to Mumbai that leads in every facility.
If you’re looking for long-term growth, these “Upcoming projects in Thane” will significantly boost your portfolio. Just be sure to check the project’s connectivity and RERA status before investing. For that, you can either consult an RERA-certified expert like me or check for yourself on the MMRDA or MahaRERA portal.
Frequently Asked Questions
When will the Thane-Borivali tunnel be ready?
Its construction is expected to be completed by 2027-28, but given the pace of work, it is proving to be the biggest game-changer project for Thane.
Is Metro Line 4 fully ready?
Yes, the civil work for Metro Line 4 is about 80-85% complete. It is currently undergoing trials, but the final testing and trials are expected to be completed by 2026.
Which area in Thane is experiencing the most growth?
Compared to today, the areas with the most infrastructure development are Ghodbunder Road, Kolshet, and Balkum, so their growth potential is the highest.
How much will property rates increase with upcoming projects?
Experts believe that upon completion of the connectivity projects, property prices could see a jump of 20% to 30%.



